New Door Installed in Pitt Meadows School
New Door Installed in Pitt Meadows School

Here is the view before we installed a new door for this Pitt Meadows School.

Here is the 16 x 8 Amarr Lincoln we installed. They didn’t have a lot of time to wait for a full view door so we ordered a stock door and had it glazed with clear windows in every bay to have the effect of the full view. Since this is for a school, they wanted the most durable motor so we installed a new LiftMaster 8587W with an I-Beam rail. This motor is the strongest one with a 3/4 HP AC chain drive. Check out the link below for more features of this motor! There is also a link to an Amarr Vista, which is a full view door, to see the difference.

